Project Description
Keene Pedestrian Bridge
Keene, New Hampshire
Bridge was (12) 50′ modules fabricated and shipped to site where they were assembled and hoisted into place. 200′ clear span over active highway forcing shut down in order to assemble and place 200′ center truss.
Project required tandem picks with a 275TON Grove and a 240TON Grove.
PROJECT DETAILS
PROJECT TYPE
Pedestrian Bridge
SIZE
600 ft long
TONS OF STEEL
835 tons
GENERAL CONTRACTOR
American Steel Fabricators
FABRICATOR
American Steel Fabricators