Project Description

Keene Pedestrian Bridge

Keene, New Hampshire

Bridge was (12) 50′ modules fabricated and shipped to site where they were assembled and hoisted into place. 200′ clear span over active highway forcing shut down in order to assemble and place 200′ center truss.

Project required tandem picks with a 275TON Grove and a 240TON Grove.

PROJECT DETAILS

PROJECT TYPE

Pedestrian Bridge

SIZE

600 ft long

TONS OF STEEL

835 tons

GENERAL CONTRACTOR

American Steel Fabricators

FABRICATOR

American Steel Fabricators

PROJECT GALLERY