Sun Microsystems 2017-05-04T00:11:25+00:00
[raw]
  • Location: Burlington, MA
  • Project Type: Eastern US Corporate Headquarters
  • Size: 1,200,000 sq ft (2 phases)
  • Tons of Steel: 4,040TONS
  • General Contractor: Whiting Turner
  • Fabricator: Supermetals

Project Highlights

The campus design consists of nine buildings that are interconnected by a single-level common facilities building. The buildings of the campus revolve around an 85-foot tall clock tower. The clock has a 7.5 foot diameter face and is solar-powered through photovoltaic modules.


[really_simple_share]
[clear][/raw]
[flagallery gid=6 name=Gallery]

[ SL ] – “slideshow” [ FS ] – “fullscreen”